Tender detail
Ventilation and air-conditioning installation
Summary
The tender concerns ventilation installation as part of a new-build project within an existing property. The scope includes a total air volume of 5,600 m3/h and covers, among other things, 2 supply and extract air units with heat recovery, 1 separate extract air unit, 25 fire dampers with accessories, 100 grilles/air outlets with accessories, 100 built-in components for airflow control, 1 weather protection grille for outside air intake, 1 exhaust air stack for exhaust discharge, 550 m2 of galvanized steel air ducts and fittings, and 350 m of galvanized steel round ducting DN 80 to DN 250. The machine-readable notice did not include precise qualification or exclusion requirements; these must be checked in the tender documents.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.