Tender detail
Mechanical engineering installation works
Summary
The tender concerns the installation of two separate hydraulic systems at the Emschermündung wastewater treatment plant: the existing system in the digestion cellar is to be replaced, and a completely new hydraulic system with valve panels and pipe routes is to be installed in the basement of the newly built sludge treatment plant. Site inspections could be arranged until 19 June 2026 in agreement with the technical contact person. The machine-readable notice did not include precise qualification, suitability or exclusion requirements; these must be checked in the tender documents.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.