Works for hydraulic and electrical connection of district heating substations to the ECOME network
Summary
The tender concerns works for connecting hydraulic and electrical sub-stations to the ECOME district heating network. The contract is divided into 3 lots: Lot 1 Périscolaire, Lot 2 CTM and Lot 3 Club House. The works include dismantling existing heating and plumbing, removing the boiler if present, installing skids supplied by DALKIA and integrating them into the sub-station, primary and secondary connection to the district heating network, protecting existing installations, preparatory works, on-site setting out, testing and inspections. Estimated works period: end of August to early September, about 1 month per lot.