Tender detail
Secondary school modular building construction works
Summary
The tender concerns the construction of a secondary school as a modular/container building. The works include around 300 containers over three storeys, kitchen and specialist room equipment, on-site classroom furniture, preparation of the substructure as an RC ground cushion and site areas as gravel surfaces, and installation of basic utility lines. The machine-readable notice did not include precise bidder qualification or exclusion requirements; these must be checked in the tender documents.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.