Tender detail
Construction of water and sewer pipelines
Summary
The tender concerns construction of sewer and drinking water networks, central hot water preparation with circulation, sanitary fixtures and dry construction pre-wall installation, including connection to the existing cold drinking water network. The machine-readable notice did not include precise qualification, exclusion or compliance requirements; these must be checked in the tender documents.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.