Tender detail
Railway bridge construction works
Summary
The tender concerns the construction of a railway bridge in Bremen, including replacement of the existing bridge structure with a reinforced-concrete full-frame bridge and adjoining trough elements for slope protection. The track gradient over the bridged section is to be raised over a length of about 600 m. The notice does not provide precise bidder qualification or exclusion requirements; these must be checked in the tender documents.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.