Tender detail
Design and execution of works for integration of the metro access control system
Summary
The tender concerns the design and execution of works for integrating the access control system of Metro Line 4 with Metro Lines 1, 2 and 3 and the TL line. The contractor must prepare technical design documents, carry out the works, supply and install equipment, integrate software and IT systems, test the installation, and train METROREX S.A. staff. The contract is planned in three stages: 3 months for design, 4 months for works, and a 60-month warranty period, for a total estimated duration of 67 months.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.