Tender detail
Construction of water pipelines for Hochbehälter Lewerberg III
Summary
The tender concerns the construction of two parallel drinking water transmission pipelines for the new Hochbehälter Lewerberg III reservoir. The scope includes supply, laying and installation of steel pipes, pipe bedding and trench backfilling, fittings and welding works, corrosion protection, pressure testing, disinfection, flushing, preparation for commissioning, and documentation and inspection services. The route length is about 68 m per pipeline.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.