Tender detail
Metal construction works for Munich Airport Terminal 1 security checkpoint C North E05
Summary
The tender concerns the conversion and creation of a new security checkpoint area at Munich Airport, Terminal 1, level 05, in the public area. The works include dismantling the existing Emirates Lounge back to shell condition and converting the area into a security control unit with new CT scanners, control lanes, waiting areas, staff rooms, lounge areas and technical zones. The contractor must carry out the works in line with aviation security requirements, airport operator requirements and the applicable safety and environmental rules. The notice does not provide precise participation requirements; these must be checked in the tender documents.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.