Tender detail
Road works
Summary
The tender concerns the construction of an approximately 600-metre road section on Vertical Axis 70 of the Egnatia Odos, connecting the Egnatia Odos with the Greece–Bulgaria border. The works include the G3 bridge and adjacent local roads, as well as the full construction of the artery with cross-section g2 (7.5/10.5 m). The design speed for this section is 60 km/h because of the mountainous terrain. The machine-readable notice did not include precise requirements; these must be checked in the tender documents.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.