Tender detail
Feasibility study and preparation of technical-economic documentation for the Mureș Green Bridge
Summary
The tender concerns the preparation of technical-economic documentation for the Mureș Green Bridge and related connecting infrastructure. The bidder must prepare the urbanism certificate and the necessary approvals, a multicriteria analysis, topographical, geotechnical, pedological, hydrological, hydraulic and hydrotechnical studies, the environmental impact assessment, a traffic study, a noise pollution study, and the feasibility study with cost-benefit analysis and a financial model. The services are to be performed over 20 months from the start order. Exact participation and compliance requirements must be checked in the tender documents.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.