Tender detail

Construction works for extending a concrete yard with installation of utilities

Summary

The tender concerns construction works for extending an existing concrete yard and installing utilities. The works must provide electricity, water and sewer lines, as well as telecommunications ducts with the necessary connections. The bidder must be prepared to confirm exclusion grounds and demonstrate technical and professional capability. The compliance conditions also include sanctions-related confirmations concerning subcontractors and suppliers, as well as a confirmation that the bid fully complies with the tender conditions.

Reference number
307225-0000
Buyer
Riigi Kaitseinvesteeringute Keskus
Country
Estonia (EST)
Procedure
Open procedure
CPV
45233120 Road construction works
Deadline
2026-04-20
Status
Evaluation
Contract subject
Works
Estimated value
Not published
Source
RHR

Participation requirements

Tender requirements are available in the official tender documents.

Compliance requirements

The bidder must confirm the mandatory exclusion grounds in the tender documents, including convictions related to participation in a criminal organisation, corruption, money laundering or terrorist financing, child labour and other forms of human trafficking, terrorism-related offences, fraud and other listed grounds. The machine-readable notice did not include the full precise list, so the official tender documents must be checked. The bidder may also need to confirm self-cleaning measures where applicable.

Qualification criteria and exclusion grounds

The bidder must prove that it has carried out at least 1 similar construction contract within the last 60 months. A similar contract means construction of a concrete surface with utility lines, where the volume of concrete works was at least 3,000 m2. Road and yard construction with utility lines and concrete works may be separate projects or contracts, but the required volume of concrete works including utility installation must be met. If the work was carried out under a public procurement procedure, the relevant reference number and a confirmation from the client or contact person that the work was performed in the required volume and properly must also be provided. If the bidder relies on the capacities of another entity, a written and signed consent from that entity and proof that it will participate directly in contract performance at least for the part relied upon must be submitted. The person responsible for design must have the following qualification: civil engineer level 6 or higher with specialisation in building design, or chartered road engineer level 7 or higher with competence in bridge construction and maintenance or road construction and maintenance. That person must have experience within the last 15 years in designing concrete pavements on at least two different sites covering at least 3,000 m2, and the experience must be evidenced by documents showing the site, type of work, total volume, period of performance and confirmation from a third party.