Tender detail

Construction of connection facilities for the public water supply and wastewater sewerage system in the detailed planning area of the Järveküla, Sepaniidu property and its surroundings

Summary

The tender concerns construction of connection facilities for the public water supply and wastewater sewerage system in the detailed planning area of the Järveküla, Sepaniidu property and its surroundings. The bidder must take into account that this is a works contract requiring registration in the business register, an average annual turnover of at least EUR 500,000 over the last three completed financial years, and prior experience with at least one similar pipeline construction project completed within the last 36 months. When submitting the bid, the bidder must confirm compliance with the procurement documents, provide a power of attorney in the case of a joint bid, declare business secrets, provide subcontractor- and sanctions-related confirmations, and submit equivalence evidence where needed.

Reference number
309879-0000
Buyer
Aktsiaselts ELVESO
Country
Estonia (EST)
Procedure
Simplified procurement
CPV
45231300 Construction work for water and sewage pipelines
Deadline
2026-06-04
Status
Open
Contract subject
Works
Estimated value
Not published
Source
RHR

Participation requirements

Tender requirements are available in the official tender documents.

Compliance requirements

The bidder must confirm that neither it nor its management, administrative or supervisory body members, procurators or other persons authorised to represent it have been finally convicted within the last five years for exclusion grounds such as participation in a criminal organisation, corruption, fraud and other offences listed in the ESPD. If an exclusion ground exists, the bidder may submit evidence of self-cleaning measures, where permitted. The bidder must also confirm that its place of residence or establishment is not in the Russian Federation or the Republic of Belarus, and that it does not use subcontractors, suppliers or relied-on entities subject to EU Council sanctions for more than 10% of the contract value. The machine-readable notice did not include precise exclusion grounds; they must be checked in the tender documents and official tender details. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules. The machine-readable notice did not include precise exclusion grounds; they must be checked in the official tender documents and tender documents if needed for full verification of sanctions and exclusion rules.

Qualification criteria and exclusion grounds

The bidder must be registered in the business register of its country of establishment. For the Estonian business register, the contracting authority checks this itself. Financial requirement: the bidder’s average annual net turnover in construction works for public water supply and sewerage facilities, calculated over the last three completed financial years before the deadline for submitting bids, must be at least EUR 500,000 per year. Form 4 must be completed for turnover. Technical and professional requirement: within the 36 months preceding the start of the procurement, the bidder must have carried out and completed at least one project for the construction of public water supply and sewerage pipelines, including at least 1 km of such pipelines within that project. The bidder must provide a short description of the contracts, the performance period, details of the other contracting party, contact details of the client’s representative, and, in the case of a public procurement, the reference numbers. On the contracting authority’s request, evidence of proper performance must be submitted. If the bidder relies on the capacities of other entities, those entities must also submit a tenderer’s ESPD, and they must not have any exclusion grounds. For bid compliance, the bidder must confirm that the bid complies with the procurement documents, that conditional bids are not allowed, that the price offer is submitted in the required structure, and that equivalence explanations and evidence are attached where necessary. In the case of a joint bid, a joint bidders’ power of attorney and Form 1 must be submitted. If subcontractors are used or other entities are relied upon, sanctions-related and replacement-related requirements also apply. The machine-readable notice did not include precise requirements; they must be checked in the official tender documents.