Tender detail

Complete reconstruction works for the apartment building of the Haapsalu, Rüütli 3 apartment association (EIS)

Summary

The tender concerns the complete reconstruction of an apartment building in Haapsalu. The contractor must carry out construction works and be ready to meet the required registration, turnover, reference project, team competence and performance bond conditions. The bidder must also confirm that its offer fully complies with the tender documents and that conditional bids are not allowed.

Reference number
310424-0000
Buyer
Haapsalu linn, Rüütli tn 3 korteriühistu
Country
Estonia (EST)
Procedure
Grant recipient purchase
CPV
45211000 Construction work for multi-dwelling buildings and individual houses
Deadline
2026-06-29
Status
Open
Contract subject
Works
Estimated value
539 324,19 EUR
Source
RHR

Participation requirements

Tender requirements are available in the official tender documents.

Compliance requirements

The bidder must confirm that none of the exclusion grounds listed in Section 95(1) points 1–3 and 5 of the Public Procurement Act apply, taking into account subsection 2. This means, among other things, that the bidder must not be bankrupt or in liquidation, no bankruptcy or liquidation proceedings may have been initiated against it, and it must not have tax, fee or environmental charge arrears, or tax or social security contribution arrears. In a joint tender, the exclusion grounds are checked for each joint bidder. The bidder must also confirm that its employees' average salary during the reference period was above 70% of the average salary for the same period in the relevant field and provide an extract from the Tax and Customs Board or equivalent evidence from a foreign competent authority. In addition, the bidder must confirm that it is not a related person to the technical consultant advising the beneficiary on the apartment building reconstruction. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The bidder must also confirm that its employees' average salary during the reference period was above 70% of the average salary for the same period in the relevant field and provide an extract from the Tax and Customs Board or equivalent evidence from a foreign competent authority. In addition, the bidder must confirm that it is not a related person to the technical consultant advising the beneficiary on the apartment building reconstruction. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The bidder must also confirm that its employees' average salary during the reference period was above 70% of the average salary for the same period in the relevant field and provide an extract from the Tax and Customs Board or equivalent evidence from a foreign competent authority. In addition, the bidder must confirm that it is not a related person to the technical consultant advising the beneficiary on the apartment building reconstruction. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents. The machine-readable notice did not include more precise exclusion requirements; they must be checked in the official tender documents or tender documents.

Qualification criteria and exclusion grounds

The bidder must be registered in the business register for construction activities covering general construction, indoor climate systems, and indoor water supply or sewerage systems. For electrical works, the bidder must also have a notification for electrical works covering the construction, including installation, of electrical installations. Foreign bidders may prove equivalent competence with equivalent evidence. The bidder's net turnover for the financial year preceding the start of the procurement procedure must be at least equal to twice the expected contract value, excluding VAT. In a joint tender, this condition may be met by at least one participant on its own; turnover may not be aggregated. The bidder must have completed at least one equivalent construction project during the 60 months before the start of the procurement procedure, with a value of at least half of the expected contract value excluding VAT. The equivalent project must have been carried out as the main contractor and must have included, at minimum, construction or reconstruction of the building load-bearing and external envelope structures, forced ventilation with heat recovery, and heating system works. The bidder must provide the project name, building details, time and value, indicate whether it was new construction, extension or full reconstruction as main contractor, and provide either the building register reference number or a copy of the handover-acceptance act. The team must include a project manager with at least level 6 construction engineer qualification specialising in building construction and construction management competence, or level 6 construction manager qualification specialising in general construction. The team must also include a site manager with at least level 5 construction work manager qualification specialising in general construction works, a ventilation and heating systems specialist with at least level 6 heating, ventilation and cooling engineer qualification or level 6 construction manager qualification specialising in indoor climate systems, a water supply and sewerage systems specialist with at least level 6 water supply and sewerage engineer qualification or level 6 construction manager qualification specialising in indoor water supply and sewerage systems, and a person involved in electrical works with at least a B-class competence certificate or level 6 electrical engineer qualification for consumer electrical installations. For each person, the bidder must provide the name and certificate or qualification number. Equivalent competence is accepted for foreign bidders. The bidder must also accept that, by the contract signing date or within 10 calendar days after signing, it must be able to provide a performance bond equal to 5% of the contract price, issued by a credit or financial institution, or deposit the corresponding amount on the beneficiary's account or a notary account under the stated conditions.